1. Number system and BODMAS

Concept: Apply brackets and powers first, then multiplication/division from left to right, then addition/subtraction from left to right.

Worked example: 18 ÷ 3 × 2 + 4 = 16.

Try it: 24 − 12 ÷ 3 × 2 = ?

Reveal answer

16

2. Fractions and decimals

Concept: Use common denominators for addition. To divide fractions multiply by the reciprocal.

Worked example: 3/4 + 2/5 = 23/20.

Try it: 0.6 × 3/4 = ?

Reveal answer

0.45

3. Percentages

Concept: Percentage = part ÷ whole × 100. Successive percentage changes multiply their factors.

Worked example: 800 increased by 15% = 920.

Try it: 20% rise followed by 20% fall: net change?

Reveal answer

4% decrease: 1.2 × 0.8 = 0.96.

4. Ratio and proportion

Concept: Divide a total in ratio a:b using a/(a+b) and b/(a+b).

Worked example: 560 in ratio 3:4 = 240 and 320.

Try it: Three workers make 45 units per hour. Five at the same rate?

Reveal answer

75 units.

5. Averages

Concept: Mean = sum ÷ count.

Worked example: Five scores averaging 64 total 320.

Try it: Four numbers average 18; add 28. New mean?

Reveal answer

20: (72+28)/5.

6. Profit, loss and discount

Concept: Profit rate is based on cost; discount rate on marked price.

Worked example: Cost 600, selling price 750: profit 25%.

Try it: Marked price 1,500 less 12%?

Reveal answer

1,320.

7. Basic algebra

Concept: Perform the same operation on both sides of an equation.

Worked example: 3(x−2)=21 gives x=9.

Try it: 4x+7=2x+19.

Reveal answer

x=6.

8. Time, speed and distance

Concept: Distance = speed × time. Average speed = total distance ÷ total time.

Worked example: 60 km/h for 45 minutes = 45 km.

Try it: 150 km in 2 hours 30 minutes: average speed?

Reveal answer

60 km/h.

9. Time and work

Concept: A job taking n days has daily rate 1/n. Add rates for simultaneous work.

Worked example: 6-day and 3-day workers together take 2 days.

Try it: 12-day and 6-day workers together?

Reveal answer

4 days: 1/12 + 1/6 = 1/4.

10. Geometry

Concept: Rectangle area = length × width; triangle area = half base × height; circle area = πr².

Worked example: Triangle base 12 cm and height 7 cm: 42 cm².

Try it: Rectangle perimeter 34 cm, length 10 cm: area?

Reveal answer

70 cm²: width 7 cm.