SC E-LEARNING | QAT & HIGH ACHIEVERS
Mathematics Study Material
Shared aptitude preparation: learn key concepts and attempt original practice questions. This is supplementary material, not an official syllabus.
1. Number system and BODMAS
Concept: Apply brackets and powers first, then multiplication/division from left to right, then addition/subtraction from left to right.
Worked example: 18 ÷ 3 × 2 + 4 = 16.
Try it: 24 − 12 ÷ 3 × 2 = ?
Reveal answer
16
2. Fractions and decimals
Concept: Use common denominators for addition. To divide fractions multiply by the reciprocal.
Worked example: 3/4 + 2/5 = 23/20.
Try it: 0.6 × 3/4 = ?
Reveal answer
0.45
3. Percentages
Concept: Percentage = part ÷ whole × 100. Successive percentage changes multiply their factors.
Worked example: 800 increased by 15% = 920.
Try it: 20% rise followed by 20% fall: net change?
Reveal answer
4% decrease: 1.2 × 0.8 = 0.96.
4. Ratio and proportion
Concept: Divide a total in ratio a:b using a/(a+b) and b/(a+b).
Worked example: 560 in ratio 3:4 = 240 and 320.
Try it: Three workers make 45 units per hour. Five at the same rate?
Reveal answer
75 units.
5. Averages
Concept: Mean = sum ÷ count.
Worked example: Five scores averaging 64 total 320.
Try it: Four numbers average 18; add 28. New mean?
Reveal answer
20: (72+28)/5.
6. Profit, loss and discount
Concept: Profit rate is based on cost; discount rate on marked price.
Worked example: Cost 600, selling price 750: profit 25%.
Try it: Marked price 1,500 less 12%?
Reveal answer
1,320.
7. Basic algebra
Concept: Perform the same operation on both sides of an equation.
Worked example: 3(x−2)=21 gives x=9.
Try it: 4x+7=2x+19.
Reveal answer
x=6.
8. Time, speed and distance
Concept: Distance = speed × time. Average speed = total distance ÷ total time.
Worked example: 60 km/h for 45 minutes = 45 km.
Try it: 150 km in 2 hours 30 minutes: average speed?
Reveal answer
60 km/h.
9. Time and work
Concept: A job taking n days has daily rate 1/n. Add rates for simultaneous work.
Worked example: 6-day and 3-day workers together take 2 days.
Try it: 12-day and 6-day workers together?
Reveal answer
4 days: 1/12 + 1/6 = 1/4.
10. Geometry
Concept: Rectangle area = length × width; triangle area = half base × height; circle area = πr².
Worked example: Triangle base 12 cm and height 7 cm: 42 cm².
Try it: Rectangle perimeter 34 cm, length 10 cm: area?
Reveal answer
70 cm²: width 7 cm.
Exam-specific practice
QAT test session | Scholarship timed test
SC E-Learning — Hub of Ultimate Study Solutions